Lean Six Sigma Green Belt Introduction Video
  • About Excelr, Agenda For Introduction
  • Preliminaries of Lean Six Sigma
  • Six Sigma Management System
  • Six Sigma Maturity Continuum
  • Introduction to Elementary Statistics
  • Measures of Central Tendency & Dispersion
  • Internet Service Provider Case Study
  • Histogram, Barplot, Normal Distribution
  • Probability Distribution Plot
  • Introduction:
Six Sigma Define Phase
  • Introduction to Define Phase & Agenda
  • VOC, VOB, CTQ
  • CTQ measures
  • Exercise on finding the CTQ from VOC, VOB
  • Selecting Relevant Project
  • Prepare Project Charter & Elements of Project Charter
  • Exercise on SMART goal of Project Charter
  • High Level Process Maps - SIPOC
  • Define Phase:
Six Sigma Measure Phase
  • Introduction to Measure Phase & Agenda
  • CLT & Basics of Measure Phase
  • Define CTQ Performance Characteristics
  • Measurement System Analysis - AAA
  • Case study on Attribute Agreement Analysis_Part 1
  • Case study on Attribute Agreement Analysis_Part 2
  • Sigma Level (Z) - Continuous Data
  • Exercise - Sigma Level Calculation
  • Sigma Level (Z) - Attribute Data
  • Yield - Traditional, FTY, RTY
  • Capability Indices - Cp, Cpk_Part 1
  • Capability Indices - Cp, Cpk_Part 2
  • Attribute Agreement Analysis Case Studies
  • Capability Indices Case studies
  • Sigma Level - Continuous Case Studies
  • Sigma Level - Attribute Data Case Studies
  • Measure Phase:
Six Sigma Analyze Phase
  • Introduction to Analyze Phase & Agenda
  • Identify all Inputs
  • Identify all Inputs - Qualitative, Affinity Analysis
  • Identify all Inputs - Fishbone Diagram
  • Value Stream Mapping
  • Risk Based Analysis Introduction
  • Risk Based Analysis - FMEA_Part 1
  • Risk Based Analysis - FMEA_Part 2
  • Pareto Chart
  • Shortlist Critical Inputs - Hypothesis Testing
  • Hypothesis Testing_Part 2
  • Hypothesis Testing_Part 3
  • Hypothesis Testing_2 Sample t test_Part 1
  • Hypothesis Testing_ANOVA_Part 1
  • Hypothesis Testing_2 Proportion Test
  • Hypothesis Testing_Chi Square Test
  • Regression Analysis_Part 1
  • Regression Analysis_Part 2
  • Regression Analysis_Part 3
  • Analyze phase
Six Sigma Improve Phase
  • Introduction to Improve Phase & Agenda
  • Identify all possible Alternate Solutions - Brainstorming
  • De Bono 6 Thinking Hats
  • Creative Thinking - Probing, Benchmarking
  • Evaluate the Generated Solutions - Pugh Matrix
  • Evaluate the Generated Solutions - Delphi Technique
  • Multivoting & NGT
  • Design of Experiments
  • Piloting
  • Improve phase
Six Sigma Control Phase
  • Introduction to Control Phase
  • Control Critical Inputs
  • Mistake Proofing
  • Visual Standards,Inspection / Audit
  • SPC - Control Charts
  • SPC - Control Charts - P & NP Charts
  • SPC - Control Charts - Part 4, C Chart
  • SPC - Control Charts - Part 5, X bar S Chart
  • Control Charts Extension & Solution Documentation
  • Control Phase
Practice Project
  • Practice Project_Part 1
  • Practice Project_Part 2
  • Practice Project_part 3
  • Practice Project_Part 4
  • Practice Project_Part 5
  • Whats Next.....?